| CPCCCA2002 |
Use carpentry tools and equipment |
Core |
| CPCCCA2011 |
Handle carpentry materials |
Core |
| CPCCCA3001 |
Carry out general demolition of minor building structures |
Core |
| CPCCCA3002 |
Carry out setting out |
Core |
| CPCCCA3003 |
Install flooring systems |
Core |
| CPCCCA3004 |
Construct and erect wall frames |
Core |
| CPCCCA3005 |
Construct ceiling frames |
Core |
| CPCCCA3006 |
Erect roof trusses |
Core |
| CPCCCA3007 |
Construct pitched roofs |
Core |
| CPCCCA3008 |
Construct eaves |
Core |
| CPCCCA3010 |
Install windows and doors |
Core |
| CPCCCA3016 |
Construct, assemble and install timber external stairs |
Core |
| CPCCCA3017 |
Install exterior cladding |
Core |
| CPCCCA3024 |
Install lining, panelling and moulding |
Core |
| CPCCCA3025 |
Read and interpret plans, specifications and drawings for carpentry work |
Core |
| CPCCCA3028 |
Erect and dismantle formwork for footings and slabs on ground |
Core |
| CPCCCM2006 |
Apply basic levelling procedures |
Core |
| CPCCCM2008 |
Erect and dismantle restricted height scaffolding |
Core |
| CPCCCM2012 |
Work safely at heights |
Core |
| CPCCCO2013 |
Carry out concreting to simple forms |
Core |
| CPCCOM1012 |
Work effectively and sustainably in the construction industry |
Core |
| CPCCOM1014 |
Conduct workplace communication |
Core |
| CPCCOM1015 |
Carry out measurements and calculations |
Core |
| CPCCOM3001 |
Perform construction calculations to determine carpentry material requirements |
Core |
| CPCCOM3006 |
Carry out levelling operations |
Core |
| CPCCWHS2001 |
Apply WHS requirements, policies and procedures in the construction industry |
Core |
| CPCWHS3001 |
Identify construction work hazards and select risk control strategies |
Core |
| CPCCCA3012 |
Frame and fit wet area fixtures |
Group A Elective |
| CPCCCA3014 |
Construct and install bulkheads |
Group A Elective |
| CPCCCM2002 |
Carry out hand excavation |
Group A Elective |
| CPCCJN3003 |
Manufacture components for doors, windows and frames |
Group A Elective |
| CPCCSF2004* |
Place and fix reinforcement materials |
Group A Elective |
| CPCCCM3005 |
Calculate costs of construction work |
Group B Elective |
| CPCCOM1013 |
Plan and organise work |
Group B Elective |